From Ankara to İzmir High-Speed Train Line Engineering Structures and Overpasses Construction Works
From Ankara to İzmir High-Speed Train Line Engineering Structures and Overpasses Construction Works. Total construction length 15 km.

About the Project
From Ankara to İzmir High-Speed Train Line Engineering Structures and Overpasses Construction Works. Total construction length 15 km.

